∂Y   ∫dL [ MGAP CPT CrossValHind ]  :  ∂Y cross-validated hindcasts data
MGAP CPT CrossValHind CrossValHind CrossValHind CrossValHind int_dL int_dL partial_Y 
∂Y cross-validated hindcasts from SOURCES:  datos de MGAP SNIA prueba.
Independent Variables (Grids)
- Forecast Lead Time in Months
-     grid: /L  (months) ordered (2.5 months) to (4.5 months) by 1.0 N= 3 pts :grid
- Time (time)
-     grid: /T  (months since 1960-01-01) ordered (16 Sep 1960 - 15 Oct 1960) to (16 Oct 1960 - 15 Nov 1960) N= 2 pts :grid
- Training period
-     grid: /T2  (months since 1960-01-01) ordered (1980) to (2011) by 12.0 N= 32 pts :grid
- Longitude (longitude)
-     grid: /X  (degree_east) ordered (59.5W) to (52.5W) by 0.5 N= 15 pts :grid
- Latitude (latitude)
-     grid: /Y  (degree_north) ordered (30S) to (35S) by 0.5 N= 11 pts :grid
Other Info
- CE
-  null
- CS
-  null
- datatype
- realarraytype
- file_missing_value
-  -999.0
- missing_value
-  NaN
- pointwidth
-  3.0
- units
- 0.0572957795130823 meter radian-1 north
- history 
- Output from CPT for 12 3-month running seasons for 1960-2009 between ECHAM4p5 GCM and CRU dataset, CPT recompiled on Mac 9.04 version
Last updated:  Thu, 04 Feb 2016 15:18:08 GMT