$integral dT2$ $integral dL$ [ MGAP CPT hindcast_date ]
| Training period | grid: /T2 (months since 1960-01-01) ordered (1980) to (2011) by 12.0 N= 32 pts :grid |
|---|---|
| Time | grid: /T (months since 01-Jan) ordered (Sep) to (Nov) by 1.0 N= 3 pts :grid |
| Forecast Lead Time in Months | grid: /L (months) ordered (2.5 months) to (4.5 months) by 1.0 N= 3 pts :grid |