$integral dL$ [ MGAP CPT CFSv2_AtlPac_sst hindcast_date ]
| Training period | grid: /T2 (months since 1960-01-01) ordered (1980) to (2014) by 12.0 N= 35 pts :grid |
|---|---|
| Time | grid: /T (months since 01-Jan) periodic (Jan) to (Dec) by 1.0 N= 12 pts :grid |
| L | grid: /L (months) ordered (2.0 months) to (5.0 months) by 1.0 N= 4 pts :grid |