$partialdiff sub L$ $integral dT$ [ MGAP CPT CFSv2_AtlPac_sst hindcast_date ]
| Training period | grid: /T2 (months since 1960-01-01) ordered (1980) to (2014) by 12.0 N= 35 pts :grid |
|---|---|
| Time | grid: /T (months since 1960-01-01) ordered (0000 1 Jan 1960) to (0000 1 Jan 1961) by 1.0 N= 13 pts :grid |
| L | grid: /L (months) ordered (3.0 months) to (4.0 months) N= 2 pts :grid |