$integral dT$ $partialdiff sub T2$ [ MGAP CPT hindcast_date ]
| T2 | grid: /T2 (months since 1960-01-01) ordered (1981) to (2010) by 12.0 N= 30 pts :grid |
|---|---|
| Time | grid: /T (months since 1960-01-01) ordered (0000 1 Sep 1960) to (0000 1 Dec 1960) by 1.0 N= 4 pts :grid |
| Forecast Lead Time in Months | grid: /L (months) ordered (2.5 months) to (4.5 months) by 1.0 N= 3 pts :grid |